TR
Türkçe
English
Русский
Français
العربية
Deutsch
Español
日本語
中文
SON DAKİKA
Hava Durumu
TR
Türkçe
English
Русский
Français
العربية
Deutsch
Español
日本語
中文

Sabiha Gökçen Airport has started the countdown for the second runway

Transportation and Infrastructure Minister Abdulkadir Uraloğlu announced the opening date of the second runway of Sabiha Gökçen Airport during a television program he participated in. Uraloğlu stated that the runway is 3540 meters long and announced that its opening will take place on the planned date of December 25th.

Haber Giriş Tarihi: 17.12.2023 16:32
Haber Güncellenme Tarihi: 17.12.2023 16:32
Kaynak: AirportHaber
Sabiha Gökçen Airport has started the countdown for the second runway

Transportation and Infrastructure Minister Abdulkadir Uraloğlu announced the opening date of the second runway at Sabiha Gökçen Airport during a television program. Uraloğlu stated that the runway is 3540 meters long and announced that its opening will take place on the planned date of December 25th.

With the opening of the second runway at Sabiha Gökçen Airport, the airport will gain the capacity to manage flight traffic more effectively and efficiently. The length of the new runway is designed to accommodate different types of aircraft and handle heavy air traffic, considered as a significant step to strengthen the overall infrastructure of the airport.

Minister Uraloğlu's statements highlight Turkey's ongoing efforts in infrastructure investments in the aviation sector and draw attention to Sabiha Gökçen Airport's growth and development goals. Such infrastructure improvements aim to enhance the country's competitiveness in international air traffic, contributing to economic growth.

Kaynak: AirportHaber

Yorum Ekle
Gönderilen yorumların küfür, hakaret ve suç unsuru içermemesi gerektiğini okurlarımıza önemle hatırlatırız!
Yorumlar
logo
En son gelişmelerden anında haberdar olmak için 'İZİN VER' butonuna tıklayınız.